background image

9/5/24 

AIM 

Aeronautical Information Manual 

Explanation of Changes 

Effective:  September 5, 2024 

a.  1

2

4. RECOGNIZING, MITIGATING, AND ADAPTING TO GPS INTERFERENCE 

(JAMMING OR SPOOFING) 

This change provides additional guidance and recommendations for jamming and/or spoofing of Global 

Positioning System (GPS) and reiterates the need for pilots’ reporting of events. 

b.  3

5

2. MILITARY TRAINING ROUTES 

This change adds explanatory material on Special Military Advisory Routes (SMARs). 

c.  4

4

12. SPEED ADJUSTMENTS 

5

4

1. STANDARD TERMINAL ARRIVAL PROCEDURES 

This change adds language to clarify that any published speed, including a chart note speed, is canceled when 

aircraft are vectored or deviate off of a procedure. 

d.  4

4

12. SPEED ADJUSTMENTS 

This change is being made to align ICAO language with NAS orders and procedures by removing “turbojet” as 

the only aircraft that can be assigned a Mach number speed. 

e.  4

5

2. AIR TRAFFIC CONTROL RADAR BEACON SYSTEM (ATCRBS) 

APPENDIX 3. ABBREVIATIONS/ACRONYMS 

This change removes the note in subparagraph 4

5

2c; FIG 4

5

3 and FIG 4

5

4 that illustrate the old systems; 

and references to Automated Radar Terminal System in Appendix 3, Abbreviations/Acronyms. 

f.  5

4

5. INSTRUMENT APPROACH PROCEDURES (IAP) CHARTS 

This change corrects the inconsistency between documents and charting to reflect the current method of 

procedure titling. 

g.  Editorial Changes 

An editorial change to subparagraph 5

1

1d corrects the time frame for updating Section Charts from 6 months 

to 56 days. 

h.  Entire Publication 

Additional editorial/format changes were made where necessary. Revision bars were not used because of the 

insignificant nature of these changes. 

Explanation of Changes 

E of Chg